Line 2 (Surat Metro)

Green Line
Overview
StatusUnder construction
LocaleSurat, Gujarat, India
Termini
  • Bhesan
  • Saroli
Stations18
Service
TypeRapid transit
SystemSurat Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockTitagarh Rail Systems[1]
Technical
Line length18.74 km (11.64 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 80 km/h (50 mph) (Top)
  • 32 km/h (20 mph) (average)
Route map

Bhesan
Botanical Garden
Ugat Varigruh
Palanpur Road
LP Savani School
Performing Art Centre
Adajan Gam
Jagdishchandra Bose Aquarium
Badri Narayan Temple
Athwa Chopati
Majura Gate Subway interchange Red Line (Under construction)
Udhna Darwaja
Kamela Darwaja
Anjana Farm
Model Town
Magob
Bharat Cancer Hospital
Saroli

Line 2 of Surat Metro also known as The Green Line (Line 2) is an under-construction metro rail line of the Surat Metro, a rapid transit system in Surat, in the state of Gujarat, India.

This line consists of 20 metro stations from Bhesan to Saroli with a total distance of 18.74 km. It is expected to be operational by December 2027.[2][3]

  1. ^ PTI (27 June 2023). "Titagarh Rail Systems bags Rs 857 cr order for Surat Metro Rail". ThePrint. Retrieved 27 June 2023.
  2. ^ "Surat Metro phase I to start operations in December 2027 – Check route, distance and stations here". www.financialexpress.com. 13 July 2023. Retrieved 5 September 2023.
  3. ^ "Surat Metro: Phase I to Start Operations in Dec 2027, Check Route, Distance, Stations and More". www.news18.com. 12 July 2023. Retrieved 5 September 2023.