Line 2 (Wuhu Rail Transit)

Line 2
Overview
StatusOperational
LocaleWuhu, Anhui, China
Termini
Stations11
Service
TypeStraddle-beam monorail rapid transit
SystemWuhu Rail Transit
Services1
Depot(s)
  • Mengxi Road Depot
  • Jiangbei Parking Lot
Rolling stockBombardier INNOVIA Monorail 300
Daily ridership73,700 passengers (peak) (1 January 2022)
History
Opened28 December 2021; 2 years ago (2021-12-28)
Technical
Line length15.787 km (9.810 mi)
Number of tracks2
CharacterElevated
Route map

Wanchunhulu
Mengxilu
Mengxi Road Depot
Huizhoulu
Haiyanlu
Zhengwuzhongxin
Yunconglu
Shenshangongyuan
district
Jiujiang
Jinghu
Wuhu Railway Station
Shenshankou
Wenhualu
Jiuziguangchang  1 

The first phase of Line 2 of Wuhu Rail Transit (Chinese: 芜湖轨道交通2号线; pinyin: Wúhú guǐdào jiāotōng èrhàoxiàn) runs between Wanchunhulu station to Jiuziguangchang station, with transfer to Line 1 at Jiuziguangchang station.[1] It consists of 11 stations and 15.787 kilometres (9.810 mi) of track.[2][3][4] It opened on 28 December 2021.[2]

  1. ^ Cite error: The named reference station was invoked but never defined (see the help page).
  2. ^ a b "芜湖官宣!单轨2号线开通时间定了!".
  3. ^ "轨道交通2号线一期进入全线调试阶段". 7 June 2021.
  4. ^ "多图!芜湖轨道交通2号线最新进展曝光,赶紧来看!". www.sohu.com.