Chengdu Metro Line 30 | |
---|---|
30 | |
Overview | |
Status | Construction |
Owner | City of Chengdu |
Locale | Chengdu, Sichuan |
Termini | |
Stations | 24[2] |
Service | |
Type | Rapid transit |
System | Chengdu Metro |
Operator(s) | Chengdu Metro Corporation |
Depot(s) | Gaobeiba Depot (高碑坝车辆段) Hongjiaqiao Depot (洪家桥停车场) |
History | |
Planned opening | 2024 |
Technical | |
Line length | 27.74 km (17.2 mi)[2] |
Number of tracks | 2 |
Character | underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | overhead lines, 1,500 V DC |
Operating speed | 80km/h |
Line 30 of the Chengdu Metro is a metro line currently under construction in Chengdu. Line 30's color is Light Pink. Phase 1 runs tangentially on the south side of the Chengdu from Terminal 2 of Shuangliu International Airport East[1] to Longquan Railway Station.[2] Phase 1 is 27.74 km long with 24 stations, all underground.[2] Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h.[3] Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao.[3]
cdmzj2022
was invoked but never defined (see the help page).30号线一期工程,起于双流机场2航站楼站,止于龙泉站。线路全长约27.74km,共设车站24座,全部为地下线