Line 30 (Chengdu Metro)

Chengdu Metro Line 30
30
Overview
StatusConstruction
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
Stations24[2]
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)Chengdu Metro Corporation
Depot(s)Gaobeiba Depot (高碑坝车辆段)
Hongjiaqiao Depot (洪家桥停车场)
History
Planned opening2024
Technical
Line length27.74 km (17.2 mi)[2]
Number of tracks2
Characterunderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Electrificationoverhead lines, 1,500 V DC
Operating speed80km/h

Line 30 of the Chengdu Metro is a metro line currently under construction in Chengdu. Line 30's color is Light Pink. Phase 1 runs tangentially on the south side of the Chengdu from Terminal 2 of Shuangliu International Airport East[1] to Longquan Railway Station.[2] Phase 1 is 27.74 km long with 24 stations, all underground.[2] Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h.[3] Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao.[3]

  1. ^ a b Cite error: The named reference cdmzj2022 was invoked but never defined (see the help page).
  2. ^ a b c d e "轨道交通30号线一期工程". Archived from the original on 2021-11-10. 30号线一期工程,起于双流机场2航站楼站,止于龙泉站。线路全长约27.74km,共设车站24座,全部为地下线
  3. ^ a b "成都轨道交通30号线一期工程 首次环境影响评价信息公开". 成都轨道集团官方网站. Retrieved 2020-02-19.