Line 3 (Chengdu Metro)

Line 3
3
A train of Chengdu Metro Line 3
Overview
StatusOperational
OwnerChengdu
LocaleChengdu, China
Termini
Stations37
Service
TypeRapid transit
SystemChengdu Metro
Services1
Operator(s)Chengdu Metro Limited
Daily ridership354,200 (2016 Peak)[1]
History
Opened31 July 2016; 8 years ago (2016-07-31)
Technical
Line length49.85 km (30.98 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Chengdu Medical College
Southwest Petroleum University
Clock Tower
Machao West Road
Tuanjiexinqu
Jinshuihe
Sanhechang
Jinhua Temple East Road
Botanical Garden
Chengdu Junqu General Hospital
Beijiao depot
Panda Avenue 9
← Outer
Inner →
Chengdu Zoo
Zhaojuesi Road South
Simaqiao 7
← Outer
Inner →
Lijiatuo
Qianfeng Road 6
← Wangcongci
Lanjiagou →
Hongxing Bridge
Chengdu Second
People's Hospital
4
← Wansheng
Xihe →
Chunxi Road 2
← Xipu
Longquanyi →
Xinnanmen
Moziqiao
Sichuan
Gymnasium
1
← Weijianian
Science City/
Yiguanmiao
Wugensong →
 
Gaoshengqiao 5
← Huagui Road
Huilong →
Hongpailou
← Inner
Outer →
Taipingyuan 7 10
Chengdu West ring line
Chuan-zang Flyover
Wuhou Flyover
Wuqing South Road 9
← Inner
Outer →
Shuangfengqiao
Longqiao Road
Hangdu Street
Yingchunqiao
Dongsheng
Shuangliu Square
Sanliba
Banqiao depot
Shuangliu West Station 10

Line 3 of the Chengdu Metro (Chinese: 成都地铁3号线; pinyin: Chéngdū Dìtiě Sān Hào Xiàn) runs in a northeast-southwest direction from Chengdu Medical College to Shuangliu West Station. The total length is 49.85 km (30.98 mi). Line 3's color is magenta. Phase 1 of this line began construction on 28 April 2012, and opened on 31 July 2016.[2]

  1. ^ "9月30日成都地铁客流达238.11万乘次 创新高". 成都全搜索新闻网. Retrieved 2016-10-02.
  2. ^ 3号线来了 31日8时30分正式开通. Chengdu Economic Daily. 2016-07-28. Retrieved 2016-07-28.