Line 3 (Guiyang Metro)

Line 3
 3 
Overview
Native name贵阳轨道交通3号线
StatusOperational
LocaleGuiyang, Guizhou Province, China
Termini
Stations29
Service
TypeRapid transit
SystemGuiyang Metro
Operator(s)Guiyang Urban Rail Transit (GYURT)
Depot(s)Dongfengzhen & Huaxinan[1]
History
Opened16 December 2023; 10 months ago (2023-12-16)
Technical
Line length43.03 km (26.74 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC with overhead catenary
Operating speed100 km/h
Current plan map of Guiyang Metro
Current plan map of Guiyang Metro

Line 3 of the Guiyang Metro (Chinese: 贵阳轨道交通3号线) is a rapid transit line in Guiyang, Guizhou, China. It is 43.03 kilometres (26.74 mi) long and has 29 stations.[1] All stations are located underground.

  1. ^ a b 贵阳市三江强制隔离戒毒所 (20 February 2023). "贵阳地铁3号线、S1号线一期车站站名征求意见!(附推荐站名)" (in Chinese). Archived from the original on 8 July 2023. Retrieved 7 July 2023.