Line 3 (Hangzhou Metro)

Line 3
 3 
Overview
StatusIn operation
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations39[2]
Service
TypeRapid transit
SystemHangzhou Metro
Services1
Operator(s)Hangzhou Metro Corporation
Depot(s)Xingqiao Depot
Xiaoheshan Stabling Yard
Cangqian Depot
Rolling stockPM178
History
OpenedFebruary 21, 2022; 2 years ago (2022-02-21)
Technical
Line length57.5 km (35.73 mi)[2]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed80 km/h (50 mph)
Route map

Cangqian Stabling Yard
1
Wushanqiancun
2
Tangjiacun
3
West Railway Station
 19  Hangzhou West Railway Station
4
North Longzhou Road
5
West Wenyi Road
6
Lvting Road
 5   16 
7
Chuangming Road
8
Quanfeng
9
Gaojiao Road
10
Liansheng Road
11
Hongyuan
district
Yuhang
Xihu
b1
Shima
b2
Xiaoheshan
Xiaoheshan Stabling Yard
b3
Pingfeng
b4
Liuxia
12
South Xixi Wetland
13
Huawu
14
Dongyue
15
Gudun Road
16
Gudang Xincun
17
Gudang
18
Huanglong Sports Center
 10 
19
Huanglong Cave
20
Wulinmen
 2 
Left arrow Chaoyang – Liangzhu Right arrow
district
Xihu
Gongshu
21
Wulin Square
 1 
Line 1 interconnection
22
West Lake Cultural Square
 1   19 
23
Chaowang Road
24
Xiangji Temple
25
Daguan
26
Shanxian
 5 
Line 5 interconnection
27
Xintiandi Street
 4 
28
Qilun Square
29
Huafeng Road
district
Gongshu
Shangcheng
30
Tongxie Road
31
Taohuahu Park
32
Dingqiao
Xingqiao Depot
33
Huahe Street
district
Shangcheng
Linping
34
Huangheshan
35
Xingqiao

Line 3 of the Hangzhou Metro (simplified Chinese: 杭州地铁三号线; traditional Chinese: 杭州地鐵三號線; pinyin: Hángzhōu Dìtiě Sānhào Xiàn) is a metro line in Hangzhou.[3][4] The line is 57.5 km long.[2] It will run in a southwest-northeast direction between Wushanqiancun station in Yuhang District and Xingqiao station[1] in Linping District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system. The line uses 6-car Class AH rolling stock, which is designed for exclusive use in Hangzhou Metro.[5]

  1. ^ a b c Cite error: The named reference Line3name was invoked but never defined (see the help page).
  2. ^ a b c "杭州地铁3号线最新进展:一期工程香积寺路站主体结构封顶 全线预计2021年年底建成". 2019-10-30.
  3. ^ "杭州地铁3号线一期年底开工". ZJNews. 14 July 2017.
  4. ^ "工可报告通过评审 地铁3号线一期"上马在即" 预计今年开工,力争亚运会前建成". Hangzhou Daily. 2 March 2017.
  5. ^ "省发展改革委关于杭州地铁3号线一期工程初步设计的批复". www.zjdpc.gov.cn. Archived from the original on 2018-02-10. Retrieved 2019-02-08.