Line 3 (Jinan Metro)

Line 3
A train of Jinan Metro Line 3
Overview
Other name(s)R3[1] (construction name)
Statusoperating
LocaleJinan
Termini
Stations18
Service
Typerapid transit
SystemJinan Metro
Rolling stock6-car Type B
History
Opened28 December 2019; 4 years ago (2019-12-28)[2]
Technical
Line length33.675 km (20.9 mi) (Future: 34.328 km (21.3 mi))
Characterunderground
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (62 mph)
Line 3
Jichangbei
Jichangnan
Linkong
Lingangbeilu
Chuanliu
Qujiazhuang
Tantou
Jinandong Railway Station
Peijiaying
Wangsheren
Zhangmatun
Bajianpu
 2 
Huayuandonglu
Dingjiazhuang
Anchengjie
Olympic Center
Longao Building
Mengjiazhuang
Longdong

Jinan Metro Line 3 (Chinese: 济南地铁3号线; pinyin: Jǐnán Dìtiě Sān Hào Xiàn) is a rapid transit line in Jinan, China. The line use six-car Type B rolling stock. The line is 33.675 kilometres (20.9 miles) long. It is completely underground.

Phase 1 of Line 3 was opened on 28 December 2019.[2] Phase 2 of Line 3 opened on 22 November 2024 (Jichangbei station is still under construction).[3][4]

  1. ^ "济南市城市轨道交通第二期建设规划社会稳定风险评估公众参与公示". 2019-05-21.
  2. ^ a b "定了!济南地铁3号线12月28日正式通车".
  3. ^ "壹探轨道 济南地铁3号线二期计划于11月22日11时通车运营". 2024-11-21.
  4. ^ "地铁3号线牵起济南四大交通枢纽". 2024-11-18.