Line 3 (Madurai Metro)

Purple Line (Line 3)
Overview
StatusProposed
Termini
  • Manalur
  • Chekanurani
Stations19
Service
TypeRapid transit
SystemMadurai Metro
Operator(s)CMRL
History
Planned openingDecember 2027
Technical
Line length23 km (14 mi)
Number of tracks2
Operating speed60 km/h (37 mph)
Route map

Manalur
Silaiman
Puliyankulam
Velammal College
Viraganoor
Teppakulam
Munichalai
Keelavasal
Therkuvasal Line 2
Madurai Junction Madurai Junction railway station
Arasaradi
Arapalayam
Bethaniapuram
Kalavasal
HMS Colony
Achampattu
Nagamalai Pudukkottai
Vadapalanji
Chekanurani

The Purple Line (Line 3) is one of the three proposed lines of Madurai Metro which is to be implemented at the Phase 2 of Madurai Metro. The line stretches from Manalur to Chekanurani. The line consists of 19 stations.[1][2]

  1. ^ "Instagram". www.instagram.com. Retrieved 29 March 2024.
  2. ^ Balasubramanian, Harini (8 April 2023). "Madurai Metro to link international airport under Phase 2". Housing News. Retrieved 29 March 2024.