Line 3 | |||
---|---|---|---|
Overview | |||
Status | Operational | ||
Owner | Ningbo | ||
Locale | Ningbo, Zhejiang, China | ||
Termini | |||
Stations | 24 | ||
Service | |||
Type | Rapid transit | ||
System | Ningbo Rail Transit | ||
Operator(s) | Ningbo Rail Transit Co., Ltd. | ||
History | |||
Opened | 30 June 2019[1] | ||
Technical | |||
Line length | 37.45 km (23.27 mi) | ||
Number of tracks | 2 | ||
Character | Underground | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
Electrification | Overhead catenary with 1,500 V DC | ||
|
Line 3 of Ningbo Rail Transit (Chinese: 宁波轨道交通3号线) is a rapid transit line in Ningbo. It starts from south Fenghua District and ends in Datong Bridge Station in Jiangbei District. In the future extension plan, the line will further extend into Luotuo Area in Zhenhai District.[2] The construction of the first section, from south Yinzhou to Datong Bridge, started on 23 December 2014.[3]