Line 3 (Suzhou Rail Transit)

Line 3
A train of Suzhou Rail Transit Line 3
Overview
StatusIn operation
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations37
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
History
Opened25 December 2019; 4 years ago (2019-12-25)[1]
Technical
Line length45.272 km (28.131 mi)[2]
Track gauge1,435 mm (4 ft 8+12 in)

Line 3 is an east-west line of Suzhou Rail Transit. The line is 45.272 kilometers long.[2] The line links the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District.

Line 3 started trial operations from December 6 to December 10, 2019.[3] Official operation started on December 25, 2019.[1]

  1. ^ a b "苏州轨道交通3号线明日(12月25日)11点30分开通". 2019-12-24.
  2. ^ a b "轨交3号线铺轨,预计2019年底试运营". 2018-01-10.
  3. ^ "轨交3号线试乘首日迎来众多市民"打卡"". 2019-12-07. 此次"万人试乘"活动时间为12月6日至10日,为期5天。每天试乘时限为7:00至19:00