The Orange Line or Line 4 is one of the planned lines of Chennai Metro. It is part of the second phase of the project and the under construction line stretches from Lighthouse to Poonamallee Bypass. The line will consist of 27 stations, out of which nine will be underground and 18 will be at grade or elevated.