Line 4 (Foshan Metro)

Line 4
 4 
Overview
StatusUnder Construction
OwnerFoshan Metro Group
LocaleFoshan (Nanhai, Sanshui and Chancheng districts)
Guangdong
Termini
Stations33
Service
TypeRapid transit
SystemFoshan Metro (FMetro)
Services1
Technical
Line length55.2 km (34.3 mi) (Phase 1)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (62 mph)
Map of Line 4 drawn to scale.

Line 4 of Foshan Metro (FMetro) (Chinese: 佛山地铁4号线; pinyin: Fóshān Dìtiě Sì Hào Xiàn) is a line under construction in Foshan. The first phase of the line will run in an L-shaped northwest-east direction, connecting Beijiang Dadao in Sanshui District with Gangkou Lu in Nanhai District, with 33 stations and 55.2 km (34.3 mi) kilometers of track.[1][2] Construction started on 15 January 2022.[3][4][5]

The line is expected to operate 6 car type B trains with a maximum speed of 100km/h, and will be fully automated and driverless.[6]

  1. ^ "佛山市城市轨道交通4号线一期线路概况". Archived from the original on 2019-05-17.
  2. ^ "地铁四号线一期真定假". Archived from the original on 2020-08-15. Retrieved 2023-05-17.
  3. ^ "佛山地铁4号线一期工程开工建设" (in Simplified Chinese). 中德工业服务区-佛山三龙湾科技城. 2022-01-17. Retrieved 2023-05-17.
  4. ^ "The first phase of Foshan Metro Line 4 starts construction". Seetao. 2022-01-17. Retrieved 2023-05-17.
  5. ^ "Construction of Foshan Metro Line 4 in full swing". Foshan News. 2023-02-17. Retrieved 2023-05-17.
  6. ^ 周龙凤 (2023-01-21). "权威访谈:佛山市轨道交通局党组书记、局长陈卫东:加快构建高质量多层次轨道交通网络体系". 佛山日报 (in Simplified Chinese). Retrieved 2023-05-17.