Line 4 | |
---|---|
4 | |
Overview | |
Status | Under Construction |
Owner | Foshan Metro Group |
Locale | Foshan (Nanhai, Sanshui and Chancheng districts) Guangdong |
Termini |
|
Stations | 33 |
Service | |
Type | Rapid transit |
System | Foshan Metro (FMetro) |
Services | 1 |
Technical | |
Line length | 55.2 km (34.3 mi) (Phase 1) |
Number of tracks | 2 |
Character | Underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 100 km/h (62 mph) |
Line 4 of Foshan Metro (FMetro) (Chinese: 佛山地铁4号线; pinyin: Fóshān Dìtiě Sì Hào Xiàn) is a line under construction in Foshan. The first phase of the line will run in an L-shaped northwest-east direction, connecting Beijiang Dadao in Sanshui District with Gangkou Lu in Nanhai District, with 33 stations and 55.2 km (34.3 mi) kilometers of track.[1][2] Construction started on 15 January 2022.[3][4][5]
The line is expected to operate 6 car type B trains with a maximum speed of 100km/h, and will be fully automated and driverless.[6]