Line 4 (Riyadh Metro)

Yellow Line
Riyadh Metro map
Overview
Other name(s)Line 4
StatusUnder construction
OwnerRoyal Commission for Riyadh City
LocaleRiyadh, Saudi Arabia
Termini
Stations9
Service
TypeRapid transit
SystemRiyadh Metro
Technical
Line length29.6 kilometers (18.4 mi)
Track gauge1,435 mm (4 ft 8+12 in)

The Yellow Line (Arabic: المسار الأصفر) or Line 4 is one of the six lines being developed in the Riyadh Metro network in Riyadh, Saudi Arabia.[1][2][3][4] It will run from King Khalid International Airport to the King Abdullah Financial District (KAFD). It will have 9 stations and 4 interchange stations, covering 29.6 km.

It was built by a consortium of FCC, Atkins, Alstom, Samsung, Strukton and TYPSA (Tecnica Y Proyectos).[3][5]

  1. ^ سبق (2017-06-04). "بالصور.. بدء تركيب حواجز المسار الأصفر بمشروع قطار الرياض". صحيفة سبق الالكترونية (in Arabic). Retrieved 2024-08-25.
  2. ^ "فيصل بن بندر يدشن أعمال تركيب جسور مترو الرياض على مسار الخط الأصفر". صحيفة مال (in Arabic). Retrieved 2024-08-25.
  3. ^ a b "Riyadh Metro, Saudi Arabia". Railway Technology. Retrieved 2024-08-25.
  4. ^ Zyl, Gareth van (2024-08-17). "Will Riyadh Metro ease the city's traffic jams? What you need to know". Retrieved 2024-08-25.
  5. ^ "Riyadh Metro completes tunneling excavation works for Green line". Alstom. Retrieved 2024-08-25.