Line 5 (Chongqing Rail Transit)

Line 5
Overview
Native name重庆轨道交通5号线
StatusOperational
Line number5
LocaleChongqing, China
Termini
Stations31
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2017; 6 years ago (2017-12-28)
Technical
Line length48.7 km (30.3 miles)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC overhead line
Operating speed120 km/h (75 mph) (Peak)
Route map

Yuegangbeilu
Shizishan depot
Yuegang Avenue
Chunxuan Avenue
Central Park West
     Line 10
Lujiagou
Ganyue Avenue
Yuhegou
The EXPO Garden Center
     Line 3
Danhe
Huxiajie
Chongguang
Hemulu
Renhe
Dazhulin depot
Xingfu Square
Ranjiaba
     Loop line      Line 6
Dalongshan
     Line 6
Dashiba
Zhongshutuo
Hongyancun
     Line 9
Xietaizi
     Line 1
Shiqiaopu
     Line 1
Shixinlu
Bashan
Fengxilu
Chongqing W
Railway Station
Bus interchange Chongqing West railway station      Loop line
Huayan Temple
Huachenglu
Banshan
Zhongliangshan
Jinjianlu
Jin'aoshan
Huayan Center
Zhongliangshan depot
Jiangtiao line
Tiaodeng
     Line 18
Shilinsi
DC 1.5 kV
AC 25 kV
Jiulongyuan
Shuangfu
Xiangtang
Shuangfu Depot
Jiangjin High-speed Railway
Shengquansi
Jijiang
Dingshan
=
Virtual interchange: transport
card only, re-entry required.

Line 5 of CRT is a rapid transit line in Chongqing, China, which opened on 28 December 2017.[1]

  1. ^ "重庆市主城形成多层次立体交通体系". May 16, 2017.