Line 5 (Nanning Metro)

Line 5
 5 
Overview
StatusOperational
OwnerNanning
LocaleNanning, Guangxi, China
Termini
Stations17
Service
TypeRapid transit
SystemNanning Metro
Services1
Operator(s)Nanning Rail Transit Corporation
Rolling stock6-car Type B
History
OpenedDecember 16, 2021; 2 years ago (2021-12-16)
Technical
Line length20.2 km (12.55 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Line 5 train interior LCDs

Line 5 of the Nanning Metro is a rapid transit line in Nanning which opened on 16 December 2021. The line is 20.2 km long with 17 stations and uses driverless 6-car Type B trains.[1][2][3]

  1. ^ "Nanning opens driverless Line 5". Metro Report International. 2021-12-23. Retrieved 2022-03-29.
  2. ^ "1st automatic metro line on run in Nanning". gxzf.gov.cn. 2021-12-24. Retrieved 2022-03-29.
  3. ^ "Initial operation of Nanning Metro Line 5 enters into stage of no-load test run". nanning.gov.cn. 2021-08-20. Retrieved 2022-03-29.