Line 5 (Ningbo Rail Transit)

Line 5
Overview
StatusOperational
OwnerNingbo
LocaleNingbo, Zhejiang, China
Termini
Stations22
Service
TypeRapid transit
SystemNingbo Rail Transit
Operator(s)Ningbo Rail Transit Co., Ltd.
History
Opened28 December 2021; 2 years ago (2021-12-28)
Technical
Line length27.9 km (17.34 mi)[1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Line 5 of Ningbo Rail Transit (Chinese: 宁波轨道交通5号线) is a rapid transit line in Ningbo. It starts from west Yinzhou District and ends in Xingzhuang Road Station in Zhenhai District. In the future extension plan, the line will extend and become a loop.[2]

The construction of the first section started on 28 September 2016.[3] The line uses GoA4 fully automated trains.[4][5] It is 27.9 km (17.3 mi) in length with 22 stations.[1] The line opened on 28 December 2021.[1]

  1. ^ a b c "宁波轨道交通5号线一期12月28日10点开通运营".
  2. ^ "宁波市轨道交通5号线工程可行性研究及相关专题研究(其他)招标公告". Ningbo Development and Reform Council. 2011-04-15. Archived from the original on 2014-03-14. Retrieved 2012-03-21.
  3. ^ "地铁5号线一期今天上午开工!工期5年" (in Chinese). 甬派客户端. 2016-09-28. Retrieved 2016-09-28.
  4. ^ "宁波轨道交通5号线一期12月28日10点开通运营". www.bl.gov.cn. Retrieved 2021-12-30.
  5. ^ 魏诗瑶, 蔡玲玲. "捷报传来!中控信息中标宁波轨道交通5号线全自动运行系统项目". WeChat Official Accounts Platform. Retrieved 2020-05-19.