Line 6 (Hangzhou Metro)

Line 6
 6 
Train of Line 6 is departing from Olympic Sports Center station
Overview
StatusPartially operational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations36
Service
TypeRapid transit
SystemHangzhou Metro
Services2
Operator(s)Hangzhou Metro Corporation
Depot(s)Shuangpu Depot
Fengbei Stabling Yard
Songjiatang Depot
Rolling stockPM119
PM146
History
Opened30 December 2020; 3 years ago (2020-12-30)
Technical
Line length58.5 km (36.4 mi) (Phase 1: 27.0 km, Phase 2: 8.3 km, Fuyang: 23.2 km)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed100 km/h (62 mph)
Route map

Future north extension
33
Goujulong
32
East Railway Station (East Square)
 19 
31
Yuanbaotang
30
Tanhua'an Road
29
Sanbao
 9 
28
Asian Games Village
Fengbei Stabling Yard
27
Fengbei
Left arrow Liangzhu – Chaoyang Right arrow
26
Qianjiang Century City
 2 
25
Expo Center
24
Olympic Sports Center
 7 
23
Xingmin
22
Jiangling Road
 1 
21
Jianghan Road
20
Changhe
 5 
19
Jianye Road
18
Chengye Road
17
Weiye Road
16
Zhejiang Chinese Medical University
 4 
Line 4 interconnection
15
Xipu Road
14
Zhipu Road
13
West Fenghua Road
Line 12 in the future
12
Xiangshan Campus, China Academy of Art
b3
Xiaming Street
b2
Kehai Road
b1
Shuangpu
Shuangpu Depot
11
Zhejiang Conservatory of Music
10
Zhongcun
district
Xihu
Fuyang
9
East Safari Park
8
Yinhu
7
Huxiaoxing
6
Shouxiang
Songjiatang Depot
5
Fuyang Coach Center
4
Gaoqiao
3
Yangbeihu
2
Gongwang Street
1
West Guihua Road
Line 6
Simplified Chinese杭州地铁六号线
Traditional Chinese杭州地鐵六號線
Transcriptions
Standard Mandarin
Hanyu PinyinHǎngzhōu Dìtiě Lìuhào Xiàn
Line 6 drawn to scale.

Line 6 (Chinese: 杭州地铁6号线) is a partially operational subway line of the Hangzhou Metro. The line runs from Shuangpu (in Xihu District) and West Guihua Road (in Fuyang District), merging at Xiangshan Campus, China Academy of Art station, stretching through the south bank of Qiantang River before turning northwest and ending at Goujulong. It connects Fuyang District with Binjiang District, Hangzhou Olympic Sports Expo Center, Qianjiang Century City and Hangzhou East Railway Station. The line is 58.75 km (36.51 mi) long.

Phase 1 and Fuyang Section was opened on 30 December 2020. Phase 2 opened on 6 November 2021.[1] The line's color is blue. In future planning, the stations from Shuangpu to Xiaming Street will merge to Line 12.

  1. ^ "来了!6号线二期明天开通,"证件照"抢先看". 2021-11-05. Archived from the original on 2021-11-05.