Line 6 (Wuhan Metro)

Line 6
Overview
StatusOperational
OwnerWuhan
LocaleWuhan, Hubei
Termini
Stations32
Service
TypeRapid transit
SystemWuhan Metro
Services1
Operator(s)Wuhan Metro Group Co., Ltd.
Rolling stockCRRC Zhuzhou Locomotive Chinese Type A
History
Opened28 December 2016; 7 years ago (2016-12-28)
Technical
Line length42.537 km (26.43 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Line 6 of the Wuhan Metro was opened on 28 December 2016. It is the fifth line of the Wuhan Metro to be opened since its creation.[1] A 7-km extension to the line opened on 26 December 2021.[2]

The northern end of the line is Xincheng 11th Road station in Dongxihu District. The southern end of the line is Dongfeng Motor Corporation station in Caidian District.

  1. ^ 武汉两条地铁线今日开门迎客 6号线堪称超级换乘线_大楚网_腾讯网. Tencent (QQ) Hubei.
  2. ^ "官宣 三线齐发,开通时间定了!". 2021-12-25.