Line 7 (Nanjing Metro)

Line 7
 7 
Overview
StatusIn operation
LocaleQixia, Gulou , Jianye, and Yuhuatai districts
Nanjing, Jiangsu
Termini
Stations10(North) 9(South)
Service
TypeRapid transit
History
Opened28 December 2022; 22 months ago (2022-12-28)[1]
Technical
Line length13.84 km (8.6 mi)(North)
10.66 km (6.6 mi)(South)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (Maximum)
Route map

Xianxinlu  8 
(Left arrow Shiyueguangchang  8  Zhonghuamen Right arrow)
Yaohuamen
Majiayuan Depot
Yaohuaxincun
Dingjiazhuangnan
Dingjiazhuang
Wanshou  6 
Xiaozhuang  1 
Mufushan
Wutang­guangchang  3 
Mufuxilu
(Up arrow North secton – Central secton Down arrow)
Zhongfulu  9 
Fujianlu  5 
Gupinggang
Link line to  4 
Caochangmen / NUA / JSSNU  4 
Qingliangshan
( 2  Jingtianlu Right arrow)
Mochouhu  2 
Dashichating
Nanhu
Yingtiandajie
(Up arrow Central Section – South Section Down arrow)
Mengdudajiedong
Xinchengkejiyuan
Zhongsheng  10 
Go below  2 
Jialinjiangdongjie
Yongchulu  S3 
Taiqinglu
Luotanglu  2 
(Left arrow Yuzui 2 )
Xishanqiao S2 
Xishanqiao Stabling Yard
(Down arrow  S2 Dangtunan)

Line 7 of Nanjing Metro is a northeast–southwest line running roughly parallel to the south bank of the Yangtze River. The line began operation on 28 December 2022.[1] This line is also the first metro line to use GoA4 automated trains in Nanjing.[2]

  1. ^ a b "1号线北延线、7号线北段今日12时开通初期运营". 南京地铁. 28 December 2022.
  2. ^ 南京市人民政府 (10 April 2020). "第一条无人驾驶地铁线7号线今年9月场外测试 坐无人驾驶地铁车头车尾都可"赏景"".