Line 9 (Chongqing Rail Transit)

Line 9
Line 9 Train on Jiahua Metro Bridge
Overview
Native name重庆轨道交通9号线
StatusOperational
Line number9
LocaleChongqing, China
Termini
Stations31 (29 in operation)
Websitehttps://www.cqmetro.cn
Service
TypeRapid transit
SystemChongqing Rail Transit
Services1
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
Depot(s)Xinqiao, Taiwan Industrial Park, Huashigou
History
Opened25 January 2022; 2 years ago (2022-01-25)[1]
Technical
Line length32.29 km (20.06 miles)[2][3] (Phase 1)
7.8 km (4.8 miles)[4] (Phase 2)
Number of tracks2
CharacterMostly underground with little sections elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead line1,500 V DC
Operating speed100 km/h (62 mph) (Maximum)
Route map

Xinqiao depot
Xinqiao
Gaotanyan
Tianlilu
Shapingba
Bus interchange China Railway      Loop line      Line 1
Xiaolongkan
     Line 1
Tuwan
Hongyancun
Fuhualu
Hualongqiao
Lijiaping
Mahuangliang
Guanyinqiao
     Line 3
Liyuchi
     Line 10
Liujiatai
Jiangbeicheng
     Line 6
Wulidian
     Loop line      Line 6
Gailanxi
Toutang
     Line 4
Baoshuigang
     Line 4
Cruise Port
Hejialiang
Shipanhe
Shangwanlu
     Line 10
Taiwan Industrial Park depot
Qinggangping
Baoshenghu
Xingke Ave.
Chunhua Ave.
Langui Ave.
Central Park East
     Line 10
Congyansi
Huashigou
Huashigou depot
=
Virtual interchange: transport
card only, re-entry required.

Line 9 of CRT is a rapid transit line in Chongqing, China.

  1. ^ Cite error: The named reference cqcb was invoked but never defined (see the help page).
  2. ^ "赛迪工程咨询监理的重庆轨道交通9号线即将开通运营". Archived from the original on April 17, 2022. 全长32.289km;共设站26座,本次开通的车站23座
  3. ^ "重庆轨道交通9号线25个站安装完成 开始调试". September 21, 2021.
  4. ^ "进展顺利!重庆地铁9号线二期工程进入铺轨阶段". November 5, 2021.