Line 9 (Guangzhou Metro)

Line 9
Line 9 train
Overview
Other name(s)M14e (2010 plan name)
M9 (2013 plan name)
Huadu line (花都线)
StatusOperational
OwnerCity of Guangzhou
LocaleBaiyun and Huadu districts
Guangzhou, Guangdong
Termini
Stations11
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
Daily ridership135,400 (2017 daily average)[1]
History
Opened28 December 2017; 6 years ago (2017-12-28)
Technical
Line length19.21 km (11.94 mi)
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines, 1,500 V DC
Route map

 3  to Panyu Square
connection to Line 3
Gaozeng
 3 
connection to Line 3
 3  to Airport South
Qingtang
Qingbu
Xinjie River
Liantang
Ma'anshan Park
Huadu Square
Huaguoshan Park
Huachenglu
Guangzhou North
Railway Station
Tianma River
Huadu Autocity
Fei'eling
Qishan Depot
future extension
Line 9
Simplified Chinese广州地铁9号线
Traditional Chinese廣州地鐵9號線
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Jiǔ Hào Xiàn
Yue: Cantonese
Yale RomanizationGwóngjāu Deihtit Gáu Houh Sin
Jyutpinggwong2zau1 dei6tit3 gau2 hou6 sin3
Line 9 train interior LCD

Line 9 of the Guangzhou Metro is a rapid transit line running across the Huadu District. It starts at Fei'eling and ends at Gaozeng, interchanging with Line 3 at Gaozeng. The total length is 20.1 km (12.49 mi) with 11 stations. Line 9's color is pale green. Line 9 was opened for operation on 28 December 2017. [2][needs update]

  1. ^ http://www.gzmtr.com/ygwm/gsgk/qynb/201806/P020180627541408016222.pdf [bare URL PDF]
  2. ^ "First-stage of Guangzhou metro line 6 to put into operation by next year". 8 August 2011. Retrieved 27 August 2012.