Lori 1 Wind Farm | |
---|---|
Country | |
Location | Lori Province |
Coordinates | 40°54′41.36″N 44°25′52.86″E / 40.9114889°N 44.4313500°E |
Status | Operational |
Commission date | 2005 |
Construction cost | US$3.2 million |
Owner | High-Voltage Electric Networks of Armenia |
Wind farm | |
Type | Onshore |
Power generation | |
Units operational | 4 x 660 kW |
Nameplate capacity | 2.6 MW Planned: 90 MW |
External links | |
Commons | Related media on Commons |
Lori 1 Wind Farm is a wind farm in Armenia located along the Bazum Mountains at Pushkin Pass in Lori, Armenia. The first wind farm in the country, it has four 660-kW wind turbines and has a capacity of 2.64 MWe.[1] Completed in December 2005 by the Iranian company Sunir with US$3.2 million funding from Iran, it is owned by the High-Voltage Electric Networks of Armenia.[1] In 2006, Lori 1 generated only 2.6 GWh of electricity (a yearly average of 296.8 KWe—about 11% of installed capacity).[2]
The Armenian and Iranian authorities have agreed to expand the wind farm up to 90 MW.[3]