Mass Rapid Transit Line 2 | |||
---|---|---|---|
Overview | |||
Status | Proposed | ||
Owner | Road Transport and Highways Division | ||
Locale | Greater Dhaka, Bangladesh | ||
Termini |
| ||
Stations | 22 | ||
Colour on map | Violet (#8031A7) | ||
Service | |||
Type | Rapid transit | ||
System | Dhaka Metro Rail | ||
Operator(s) | Dhaka Mass Transit Company Limited | ||
Depot(s) | Matuail, Demra Thana | ||
Technical | |||
Line length | 35 kilometres (22 mi) | ||
Number of tracks | 2 | ||
Character | Elevated and underground | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 750 V DC third rail and 1,500 V DC overhead catenary | ||
Operating speed | 100 km/h (62 mph) | ||
Highest elevation | 13 metres (43 ft) | ||
|
The MRT Line 2 (Bengali: এমআরটি লাইন ২) is Dhaka's proposed rapid transit line. Despite the number, it will be the fifth of the Dhaka Metro Rail system and will be operated by Dhaka Mass Transit Company Limited (DMTCL). It is scheduled to open in 2030.