MRT Line 7 (Metro Manila)

MRT Line 7
Hyundai Rotem trains in September 2021
Overview
StatusUnder construction
OwnerDepartment of Transportation
Line number7
LocaleMetro Manila and Bulacan
Termini
Stations14[1]
Service
TypeRapid transit
SystemManila Metro Rail Transit System
Services1
Operator(s)SMC Mass Rail Transit 7 Incorporated[1]
Rolling stockClass 000 EMUs
Daily ridership300,000 (initial)
850,000 (design capacity)
History
CommencedAugust 15, 2017; 7 years ago (2017-08-15)
Planned opening2025 (partial)
2027 (full)[2]
Technical
Line length24.069 km (14.956 mi)
Number of tracksDouble-track
CharacterGrade separated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail[3]
Average inter-station distance1.85 km (1.15 mi)
Route map

San Jose Del Monte
Tala
Depot
Sacred Heart
Quirino Avenue
Mindanao Avenue
Regalado Avenue
Doña Carmen
Manggahan
Batasan
Don Antonio
Tandang Sora
University Avenue
Quezon Memorial Circle
North EDSA
 MMS 
3

The Metro Rail Transit Line 7, also known as MRT Line 7 or MRT-7, is a rapid transit line under construction in the Philippines. When completed, the line will be 22.8 kilometers (14.2 mi) long, with 14 stations, and the first line to have a third rail electrification.[3] The line runs in a northeast–southwest direction, beginning at San Jose del Monte, Bulacan up to the North Triangle Common Station in North Avenue, Quezon City.

First planned in 2001 and approved in 2004,[4][5] the 25-year concession agreement was signed in 2008 between the Philippine government and the project's original proponent, Universal LRT Corporation.[6] However, construction has been repeatedly delayed due to right-of-way issues. The project was re-approved in 2013,[6] while funding for the project was obtained in 2016.[7] Construction on the line began the following year and is slated to partially open by 2025 due to route realignment.[8][2] The project will cost an estimated 62.7 billion (US$1.54 billion),[9] with additional plans are laid for capacity expansion in order to accommodate the possible increase in passenger ridership in the future.

It is integrated with the public transit system in Metro Manila, and passengers also take various forms of road-based public transport, such as buses, to and from a station to reach their intended destination.

  1. ^ a b Cite error: The named reference pppOffical_MRT7main was invoked but never defined (see the help page).
  2. ^ a b Cordero, Ted (May 24, 2024). "FMRT-7 hits nearly 70% progress rate — DOTr". GMA Integrated News. Retrieved June 1, 2024.
  3. ^ a b Gines, Ben Jr. (December 17, 2021). "MRT-7 gets new train sets". The Manila Times. Archived from the original on March 11, 2022. Retrieved March 11, 2022.
  4. ^ Cite error: The named reference July2021update was invoked but never defined (see the help page).
  5. ^ Cite error: The named reference ferriols2004 was invoked but never defined (see the help page).
  6. ^ a b Cite error: The named reference ppp2 was invoked but never defined (see the help page).
  7. ^ Cite error: The named reference camus2016 was invoked but never defined (see the help page).
  8. ^ Cite error: The named reference gma2017 was invoked but never defined (see the help page).
  9. ^ Cite error: The named reference ppp was invoked but never defined (see the help page).