Matiri Project | |
---|---|
Country | New Zealand |
Location | Matiri Valley, Tasman District |
Coordinates | 41°39′43″S 172°20′4″E / 41.66194°S 172.33444°E |
Status | Operational |
Commission date | 11 December 2020 |
Owner | Southern Generation Partnership |
Operator | Pioneer Energy |
Thermal power station | |
Primary fuel | Hydropower |
Power generation | |
Nameplate capacity | 4.6 MW |
External links | |
Commons | Related media on Commons |
The Matiri Project is a run-of-river hydroelectric scheme at Lake Matiri and the Matiri River in the South Island of New Zealand. The project takes water from a series of intake weirs at Lake Matiri and pipes it through a 2.4 km long buried pipeline to a power station.[1]
The project was originally proposed by New Zealand Energy Limited, which applied for resource consent for a 4.6 MW station in August 2008.[2] The scheme was opposed by environmentalists and kayakers some of whom were angry that the resource consents were not notified nationwide.[3] The proposal was approved and it included a concession granted by the Department of Conservation to build structures on public land. Forest and Bird did not see that there would be any conservation gain in giving the approval.[4]
The development rights were purchased by Pioneer Energy in 2014.[1] Construction began in 2018.[5] Construction was delayed by a slip[6] and by the COVID-19 pandemic, and the scheme was finally commissioned in December 2020.[1] Ownership was transferred to the Southern Generation partnership on completion.[1]