Mesgi'g Ugju's'n Wind Farm | |
---|---|
Country | Canada |
Coordinates | 48°13′05″N 66°42′26″W / 48.21806°N 66.70722°W |
Status | Operational |
Construction began | June 22, 2015 |
Commission date | 2017 |
Construction cost | $330,000,000 (2013) |
Owner | Parc éolien Mesgi'g Ugju's'n (MU) S.E.C |
Wind farm | |
Hub height | 100 m |
Rotor diameter | 114 m |
Rated wind speed | 12 m/s |
Site area | 25,863 ha |
Power generation | |
Units operational | 47 |
Make and model | Senvion 3.2M114[1] |
Nameplate capacity | 149.25 MW |
External links | |
Website | www |
The Mesgi'g Ugju's'n (MU) Wind Farm, "big wind" in Mi'gmaq is a 149.25 megawatt (MW) wind farm currently under construction in eastern Quebec, Canada. The MU wind farm is expected to produce enough electricity to power approximately 30,000 homes.[2] The wind project is owned and developed in a 50-50 partnership between the three Mi’gmaq First Nations (Listuguj, Gesgapegiag, Gespeg[3]) and Innergex Renewable Energy.[4][5]
The wind farm became operational in 2017.