NLEX Connector

NLEX Connector
NLEX Connector Road
NLEX–SLEX Connector Road
NLEX Connector Caloocan España 50.jpg
The expressway southbound towards Caloocan Interchange in Caloocan
Route information
Maintained by NLEX Corporation
Length7.7 km[a] (4.8 mi)
  • Section 1 (Caloocan–España): 5.15 km (3.20 mi)
  • Section 2 (España–Magsaysay): 2.55 km (1.58 mi) (under construction)[b]
Existed2019–present
RestrictionsNo motorcycles below 400cc
Major junctions
North end E5 (NLEX Harbor Link) in Caloocan
Major intersections N180 (Magsaysay Boulevard) in Sampaloc and Santa Mesa, Manila
South endMetro Manila Skyway in Santa Mesa, Manila
Location
CountryPhilippines
RegionsMetro Manila
Major citiesCaloocan and Manila
Highway system
  • Roads in the Philippines

NLEX Connector (North Luzon Expressway Connector), also known as the NLEX–SLEX Connector Road (North Luzon Expressway–South Luzon Expressway Connector), NLEX Connector Road, and NLEX Segment 11 during the planning stages,[3] is a 7.7-kilometer (4.8 mi), four-lane elevated expressway in Metro Manila, Philippines. It connects the NLEX Harbor Link to the Metro Manila Skyway, which connects further to the North and South Luzon Expressways. The highway traverses parallel to the PNR Metro Commuter Line. It has five interchanges, four of which are currently operational. Alongside NLEX Harbor Link, trucks are allowed to use it.[1]

Construction began in 2019, and the connector was partially opened in March 2023.[4] Its remaining section up to Santa Mesa is under construction and expected to be completed by the end of 2024.[1][5][6]

  1. ^ a b c "NLEX–SLEX Connector Road Project". Department of Public Works and Highways. Retrieved June 1, 2023.
  2. ^ Cite error: The named reference oct28 was invoked but never defined (see the help page).
  3. ^ "MPTC to build P17-billion NLEX-SLEX road". Philstar.com. September 26, 2010. Retrieved July 15, 2023.
  4. ^ Santiago, Red (March 29, 2023). "The Caloocan-España section of the NLEX Connector Road is now open". VISOR.PH.
  5. ^ Tabile, Justine Irish (March 27, 2023). "NLEX connector road segment 2 set to open as early as June". BusinessWorld. Retrieved March 29, 2023.
  6. ^ 3rd State of the Nation Address of His Excellency Ferdinand R. Marcos Jr. President of the Philippines to the Congress of the Philippines (Speech). Presidential Communications Office. July 22, 2024.


Cite error: There are <ref group=lower-alpha> tags or {{efn}} templates on this page, but the references will not show without a {{reflist|group=lower-alpha}} template or {{notelist}} template (see the help page).