New Guildford line | |||
---|---|---|---|
Overview | |||
Status | Operational | ||
Owner | Network Rail | ||
Locale | Surrey, South East England | ||
Termini | |||
Service | |||
Type | Suburban rail, Heavy rail | ||
System | National Rail | ||
Operator(s) | |||
Rolling stock | |||
History | |||
Opened | 1885 | ||
Technical | |||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | Third rail, 750 V DC | ||
|
New Guildford line |
---|
The New Guildford line, presently operated by South Western Railway, is a commuter line between London Waterloo and Guildford. It branches off the South West Main Line at Hampton Court Junction, just south-west of Surbiton. On timetables, trains on this route are advertised as going to Guildford via Cobham.
Rush hour services provide two (inbound) morning services and one (outbound) evening service non-stop between Surbiton and Waterloo. Off-peak services run twice per hour (once on Sundays) and are slower, stopping at all intermediate stations except between Surbiton and Wimbledon.[1]
A nominally independent company, the Guildford, Kingston and London Railway, proposed a line broadly similar to the present-day route, but joining to the District Railway at Putney Bridge. That scheme failed when the London and South Western Railway (LSWR) agreed to build the present route, including a branch from Effingham Junction to Leatherhead. It opened in 1885. The short section from Hampton Court Junction to Claygate was electrified in 1916, and from Claygate to Guildford in 1925.