New Pamban Bridge | |
---|---|
Coordinates | 9°16′57.25″N 79°12′5.91″E / 9.2825694°N 79.2016417°E |
Carries | Rail |
Locale | Rameswaram, Tamil Nadu, India |
Owner | Indian Railways |
Characteristics | |
Total length | 2,070 metres (6,790 ft) |
No. of spans | 100 |
Rail characteristics | |
No. of tracks | 1 |
History | |
Construction start | February 2020 |
Construction end | 2025 (expected) |
Location | |
The New Pamban Bridge (pronounced: /pɑːmbən/ romanised: pāmban) is a railway bridge under construction that will connect the town of Mandapam in mainland India with Rameswaram on Pamban Island.[1] The new bridge is constructed parallel to the iconic Pamban bridge opened in 1914 and will replace it. The new Pamban bridge with a length of 2,070 metres (6,790 ft) will be India's first ever vertical lift sea bridge once opened. It is expected to be opened in 2025 year start.[2]