NorthConnect | |
---|---|
Location | |
Country | Norway United Kingdom (Scotland) |
From | Samnanger, Norway |
Passes through | North Sea |
To | Peterhead, Aberdeenshire, Scotland (preliminary) |
Ownership information | |
Owner | NorthConnect |
Partners | Agder Energi, Norway E-CO, Norway Lyse Energi, Norway Vattenfall, Sweden |
Operator | NorthConnect |
Construction cost | £1.3 billion[1] |
Technical information | |
Type | submarine cable |
Type of current | HVDC |
Total length | 650 km (400 mi) |
Power rating | 1,400 MW[2] |
The NorthConnect (also known as Scotland–Norway interconnector) was a proposed 650 km (400-mile) 1,400 MW HVDC interconnector over the floor of the North Sea.