North Spokane Corridor

U.S. Route 395 marker

North Spokane Corridor

U.S. Route 395 North Spokane Corridor
Planned route for the North Spokane Corridor
Route information
Maintained by WSDOT
Length6.99 mi[1] (11.25 km)
Planned: 10.5 miles (16.9 km)
HistoryFirst segment opened August 22, 2009
Planned completion by December 2030[2]
Major junctions
South end I-90 / US 395 in Spokane
Major intersections SR 290 in Spokane
US 2 in Spokane
North end US 395 in Spokane
Location
CountryUnited States
StateWashington
CountySpokane
Highway system
SR 339 SR 397

The U.S. Route 395 North Spokane Corridor (NSC) is a 10.5-mile-long (16.9 km) freeway—with 7 miles (11 km) complete and currently operational—running north–south along the eastern border of Spokane, Washington and parts of unincorporated Spokane County to the north.

The $2.2 billion (2009 dollars) project is designed to improve freight and commuter mobility through the Spokane metropolitan area. As of 2023, only the northern half from Wellesley Avenue to U.S. Route 395 is open to traffic; the southern half received state funding in 2015 and is anticipated to be completed by December 2030.

The project is being managed by the Washington State Department of Transportation (WSDOT) and will ultimately create a freeway with a speed limit of 60 mph (97 km/h) along a new alignment linking Interstate 90 (I-90), to the existing US Route 395 (US 395) 10.5 miles (16.9 km) to the north in the Wandermere area. When completed, the multi-modal facility is expected to have general travel lanes, with right-of-way reserved for a future high-capacity transit system with park-and-ride lots. Additionally, a pedestrian and bicycle trail will run along the entire highway alignment.[3] The project is ranked 19 of 43 on the Congressional High Priority Corridor list of the National Highway System.[4] When completed, the corridor is expected to carry over 150,000 vehicles per day.[5]

  1. ^ Multimodal Planning Division (February 17, 2024). State Highway Log Planning Report 2023, SR 2 to SR 971 (PDF) (Report). Washington State Department of Transportation. pp. 1370–1373. Retrieved March 24, 2024.
  2. ^ "NSC Project Summary". Washington State Department of Transportation. May 15, 2023. Retrieved May 16, 2023.
  3. ^ Staff. "Multi Modal Facility". US 395—North Spokane Corridor. Washington State Department of Transportation. Retrieved November 10, 2011.
  4. ^ Staff. "NSC Quick Facts". US 395—North Spokane Corridor. Washington State Department of Transportation. Archived from the original on October 20, 2014. Retrieved November 10, 2011.
  5. ^ What are the benefits?, http://www.wsdot.wa.gov/NR/rdonlyres/6ABA0621-33AF-4350-B3C6-D0BFF4C5D21D/0/Benefits.pdf