Northern Line (Cape Town)

Northern Line
Overview
StatusOperational
OwnerPRASA
LocaleCape Town, South Africa
Termini
Stations48
Service
TypeCommuter rail
SystemMetrorail Western Cape
Services4
Operator(s)Metrorail
Rolling stockClass 5M2
Class 10M5
X'Trapolis Mega
Technical
Track gauge1,067 mm (3 ft 6 in)
ElectrificationOverhead catenary
Route map

Cape Town
0:00
0:00
SA road N2.svg
N2
Eastern Blvd
Woodstock
0:03
0:03
Esplanade
Salt River
0:07
0:09
Ysterplaat
M5 ZAF jct.svg
M5
Black River Pkwy
Koeberg Road
0:09
Maitland
0:12
Cape Flats Line &
Central Line via Pinelands
0:13
Kentemade
Woltemade
0:15
0:15
Century City
Mutual
0:17
0:18
Acacia Park
Thornton
0:20
0:21
Monte Vista
Goodwood
0:22
Vasco
0:24
0:25
De Grendel
Elsies River
0:27
0:27
Avondale
Parow
0:30
0:30
Oosterzee
Tygerberg
0:32
Bellville
0:33
0:00
Central Line
Lavistown branch
0:04
Stikland
SA road R300.svg
R300
Kuils River Fwy
Kuils River
0:06
0:08
Brackenfell
Blackheath
0:11
0:13
Eikenfontein
Melton Rose
0:15
0:16
Kraaifontein
Eerste Rivier
0:18
Fisantkraal
Faure
0:24
Mellish
Firgrove
0:30
Mikpunt
Somerset West
0:36
Klipheuwel
Van der Stel
0:39
Wintevogel
SA road N2.svg
N2
Settler's Way
Kalbaskraal
Strand
0:44
Abbotsdale
Lynedoch
0:25
Malmesbury
Vlottenburg
0:29
Stellenbosch
0:35
Du Toit
0:44
Koelenhof
0:50
0:56
0:27
Muldersvlei
0:33
Klapmuts
0:42
Paarl
0:47
Huguenot
0:50
Dal Josafat
0:54
Mbekweni
0:59
Wellington
Malan
Soetendal
Hermon
Voelvlei
Gouda
Tulbaghweg
Artois
Wolesley
Romans River
Breë River
Botha
Goudini Road
Worcester

The Northern Line is a commuter rail service in South Africa that in the Cape Town metropolitan area and its surroundings and is operated by Metrorail Western Cape. Northern Line services operate from central Cape Town to Bellville, and then from Bellville along three different routes. The first route runs along the main Cape Town–De Aar railway line to Paarl and Wellington. The second route passes through Stellenbosch to terminate at Muldersvlei station on the main line, while the third also passes through Somerset West to terminate in Strand.[1]

Operations on the Northern Line halted in March 2020 in response to the Covid-19 pandemic. Operations resumed in late 2021 with trains on the relief main line past Century City and Monte Vista terminating at Kraaifontein. In early 2022, operations on the old main line through Salt River and Maitland as well as operations to Wellington resumed. In November 2023, operations to Strand resumed. In 2024, operations on the line to Muldersvlei station through Stellenbosch resumed. As of September 2024, all segments of the Northern Line are operational.

  1. ^ "Timetables". Metrorail Western Cape. Retrieved 12 July 2010.