PMSS Kashmir underway on 12 February 2019
| |
History | |
---|---|
Pakistan | |
Name | Kashmir |
Namesake | Kashmir |
Owner | Pakistan Maritime Security Agency |
Builder | Huangpu Wenchong Shipyard, China CSSC |
Laid down | 16 August 2016 |
Launched | 7 September 2018 |
Commissioned | 20 July 2018 |
Homeport | Port of Karachi |
Identification | Pennant number: P-143 |
Status | Active |
General characteristics | |
Class and type | Kashmir-class multi-purpose vessel |
Displacement | 1,550 tons |
Length | 94 m (308 ft 5 in) |
Beam | 12 m (39 ft 4 in) |
Propulsion | 2 × MAN diesel engines |
Speed | 26 knots (48 km/h; 30 mph) |
Range | 3,500 nmi (6,500 km; 4,000 mi) at 26 knots (48 km/h; 30 mph) |
Sensors and processing systems |
|
Armament |
|
Aircraft carried | 1 × helicopter |
Aviation facilities | Flight deck and hangar |
PMSS Kashmir is the lead ship of the Kashmir class of multipurpose vessels (MPVs) that was commissioned on 20 July 2018 at Haungpu Shipyard, Guangzhou, China[1][2][3] and was launched[4] and formally inducted into Pakistan Maritime Security Agency Fleet as part of OSRON-26 Squadron on 7 September 2018.[2][5][6]