PNR South Long Haul

PNR South Long Haul
The South Long Haul project map as of April 2021.
Overview
StatusOn hold
OwnerDepartment of Transportation
LocaleSouth Luzon
Termini
Continues fromNorth–South Commuter Railway
Stations35
Service
TypeInter-city rail
Higher-speed rail
Freight rail
Services3
Operator(s)Philippine National Railways
Depot(s)San Pablo, Tagkawayan and Daraga
Rolling stockDiesel multiple units
HXN diesel locomotives
Daily ridership100,000
History
Planned openingTBA
Opened1916 (PNR South Main Line)
Closed2014
Technical
Line length565 km (351 mi)[a]
Track length565 km (351 mi)[a]
Number of tracksSingle-track[b]
CharacterGrade-separated[c]
5.05 m (16 ft 7 in) minimum clearance
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Old gauge1,067 mm (3 ft 6 in) narrow gauge[d]
Minimum radius400 m (1,300 ft) (critical)
1,200 m (3,900 ft) (standard radius at 120 km/h)
ElectrificationNone
Operating speed
  • Passenger:
  • 160 km/h (100 mph)
  • Freight:
  • 80–100 km/h (50–60 mph)
SignallingETCS Level 1; CSM-KA
Highest elevation150 m (490 ft) near Ilawod–Comun Road, Camalig, Albay
Maximum incline20
Average inter-station distance17.24 km (10.71 mi)
Route map

To Tutuban  NSCR 
Sucat
Other NSCR stations
Other NSCR stations
Mamatid  NSCR 
Banlic
Banlic Railyard  NSCR 
To Calamba  NSCR 
San Cristobal River
San Juan River
Bucal
Los Baños
Bay viaduct
Batangas branch
San Antonio
Rosario
Ibaan
Tinga Labac
Batangas Passenger Terminal
San Pablo
San Pablo Railyard
Candelaria
Iyam River
Lucena
Dumacaa River
Pagbilao
Agdangan
Gumaca
Lopez
Calauag
Sumulong River
Tagkawayan
Tagkawayan Railyard
Sabang River
Liboro
Lohong River
Lupi
Libmanan River (Lupi crossing)
Sipocot
Libmanan
Libmanan River (Libmanan crossing)
Bicol River
Naga
Pawili River
Pili
Waras River
Iriga
Antipolo/Libis River
Agos River
Polangui
Tobgon River
Ligao
Cabilogan River
Guinobatan
Daraga
Daraga Railyard
Legazpi branch
Legazpi
Castilla
Sorsogon
Casiguran
Irosin
Matnog

The PNR South Long Haul, also known as the PNR Bicol, is a planned inter-city rail line project in southern Luzon, Philippines.[1] It is part of the larger Luzon Rail System,[2] a network of long-distance standard-gauge lines being built by the Philippine National Railways throughout Luzon. It is one of the two lines that will reconstruct the historic PNR South Main Line, along with the electrified North–South Commuter Railway South section to Calamba, Laguna.

The line will initially begin at Banlic station in Calamba, Laguna and terminate at Daraga, Albay. There will also be additional extensions, infill stations, and branch lines. The masterplan line shall connect passengers from Sucat station in Muntinlupa to either the Batangas International Port, Legazpi, Albay, or Matnog, Sorsogon. Freight trains will also serve the line and there will be an eventual extension of the line to the Port of Manila.

The project is estimated to cost 175 billion (US$3.45 billion) and financing for the line was originally supposed to be supported by Chinese official development assistance, which was later withdrawn in 2023. Construction for the line has been postponed for various reasons. The line was to be partially operable between San Pablo and Lucena by 2025, and the first phase between Banlic and Daraga would be fully opened by 2027.[3][4][5] After China's withdrawal of loans, the government is still waiting to find new sources of financing and have discussions with other countries.[6][7][8]


Cite error: There are <ref group=lower-alpha> tags or {{efn}} templates on this page, but the references will not show without a {{reflist|group=lower-alpha}} template or {{notelist}} template (see the help page).

  1. ^ Balinbin, Arjay (June 10, 2021). "Design bids solicited for PNR Bicol project". BusinessWorld. Archived from the original on July 19, 2021. Retrieved July 19, 2021.
  2. ^ "Railways Sector". www.dotr.gov.ph. Archived from the original on January 3, 2022. Retrieved July 19, 2021.
  3. ^ Cite error: The named reference philstar2025 was invoked but never defined (see the help page).
  4. ^ Balinbin, Arjay L. (August 29, 2021). "Work on China-funded railway to start in March". BusinessWorld. Archived from the original on September 10, 2021. Retrieved September 10, 2021.
  5. ^ USAPING BAYAN JANUARY 20, 2022 (Television production). SMNI News. January 20, 2022. Archived from the original on January 20, 2022. Retrieved January 20, 2022.
  6. ^ "Alternative railway loans still pending after stalled China ODA". BusinessWorld. Retrieved November 14, 2024.
  7. ^ Cite error: The named reference :0 was invoked but never defined (see the help page).
  8. ^ Cite error: The named reference :1 was invoked but never defined (see the help page).