Mission type | Deployment of one satellite. |
---|---|
Operator | ISRO |
Website | ISRO website |
Mission duration | 12 minutes |
Spacecraft properties | |
Spacecraft | Polar Satellite Launch Vehicle |
Spacecraft type | Launch vehicle |
Manufacturer | ISRO |
Launch mass | 295,000 kilograms (650,000 lb) |
Payload mass | 846 kilograms (1,865 lb)[1] |
Start of mission | |
Launch date | 05:12:00, September 20, 1993IST) | (
Rocket | PSLV |
Launch site | Satish Dhawan Space Centre |
Contractor | ISRO |
End of mission | |
Disposal | Failed |
Deactivated | 20 September 1993 |
Payload | |
IRS-1E (could not be placed in orbit). | |
PSLV-D1 was the first mission of the PSLV program.[1] The rocket carried IRS-1E satellite but could not deploy it as the mission failed due to a software error in on board guidance and control processor. PSLV-D1 was launched at 5:12 a.m. IST on 20 September 1993. This mission was the only full failed mission under the PSLV program until the launch of PSLV-C39.[2][3][4][5]
{{cite news}}
: CS1 maint: unfit URL (link)