Panyu Square station

Panyu Square

番禺广场
Guangzhou Metro
Platform 4 (Line 18 southbound platform)
Chinese name
Simplified Chinese番禺广场站
Traditional Chinese番禺廣場站
Transcriptions
Standard Mandarin
Hanyu PinyinPānyú Guǎngchǎng Zhàn
Yue: Cantonese
Yale RomanizationPūn'yùh Gwóngchèuhng Jaahm
JyutpingPun1jyu4 Gwong2coeng4 Zaam6
General information
LocationPanyu District, Guangzhou, Guangdong
China
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 3
     Line 18
     Line 22
Platforms6 (3 island platforms)
Tracks6
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code301 1803 2201
History
Opened30 December 2006; 17 years ago (2006-12-30) (Line 3)
28 September 2021; 3 years ago (2021-09-28) (Line 18)
31 March 2022; 2 years ago (2022-03-31)
(Line 22)
Services
Preceding station Guangzhou Metro Following station
Bangjiang
towards Haibang
Line 3 Shiqiao
towards Airport North (Terminal 2) or Tianhe Coach Terminal
Nancun Wanbo
towards Xiancun
Line 18 Hengli
towards Wanqingsha
Shiguanglu
towards Chentougang
Line 22 Terminus

Panyu Square station (simplified Chinese: 番禺广场站; traditional Chinese: 番禺廣場站; Cantonese Yale: Pūn'yùh Gwóngchèuhng Jaahm) is a station of Line 3, Line 18 and Line 22 of the Guangzhou Metro. Line 3 started operation on December 30, 2006, Line 18 started operation on September 28, 2021 and Line 22 started operation on March 31, 2022.

The station is located under the junction of Donghuan Road (东环路) and East Qinghe Road (清河东路) in the Shiqiao Subdistrict, in Panyu District, Guangzhou.[1] Panyu Square is a newly developed area to the south of Shiqiao, surrounded by the new Panyu District Government Building (新番禺区政府大楼), hotel and high-rise buildings.[2][3]

Between April 16, 2022 and August 19, 2022, to provide easier access for passengers going from Line 22 in the direction of Xiancun on Line 18, all Line 22 trains only used platform 5, and platform 6 has been taken out of use as a reserved platform. Passengers for Wanqingsha on Line 18 had to pass through the transfer concourse to reach platform 4. This arrangement has been cancelled since August 20, 2022.

The station was the southern terminus of Line 3 until the eastern extension to Haibang opened on November 1, 2024.

  1. ^ Panyu Square
  2. ^ "Introduction of Metro Line 3". Archived from the original on 2008-10-04. Retrieved 2008-12-16.
  3. ^ Panyu Metro Stop