Pasar Klang LRT station

 SA18  Pasar Klang
Rapid KL Logo | Future LRT station
General information
LocationKlang, Selangor
Malaysia
Owned byPrasarana Malaysia
Operated byRapid Rail
Line(s)Rapid KL (brand) 11 Shah Alam
Platforms2 side platforms
Tracks2
Construction
Structure typeElevated
ParkingAvailable
Other information
StatusUnder construction
Station code SA18 
History
Previous namesPasar Besar Klang
Services
Preceding station Following station
Bandar Baru Klang
towards Bandar Utama
Shah Alam Line
Future service (opening 2025)
Jalan Meru
towards Johan Setia

The Pasar Klang LRT station is a light rapid transit (LRT) station that serve the suburb of Kawasan 17 Klang in Selangor, Malaysia. It is one of the stations on the Shah Alam line. The station is an elevated rapid transit station in Klang, Selangor, Malaysia, forming part of the Klang Valley Integrated Transit System.[1]

The station is marked as Station No. 18 along the RM9 billion line project with the line's maintenance depot located in Johan Setia, Klang. The Pasar Klang LRT station was expected to be operational in February 2024, but Transport Minister Anthony Loke mentioned that the overall line would be expected to be operational by 1 March 2025 adding more delays to the opening of the Shah Alam Line.[2] It will have facilities such as multi-story park and ride, kiosks, restrooms, elevators, taxi stand and feeder bus among others.[3]

  1. ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015-05-22. Retrieved 2015-05-17.
  2. ^ "LRT3 TO START OPERATION IN MARCH 2025 - ANTHONY LOKE". BERNAMA. 2023-04-07. Retrieved 2023-07-05.
  3. ^ "Jangka Masa Projek LRT3". Prasarana Malaysia. Archived from the original on 2015-05-27. Retrieved 2015-05-17.