The S1 had a unique 6-4-4-6wheel arrangement, meaning that it had two pairs of cylinders, each driving two pairs of driving wheels. To achieve stability at fast passenger train speeds (above 100 mph), articulation was not used. The S1 was completed on January 31, 1939, at Altoona shop, and was numbered 6100.
At 140 ft 2+1⁄2 in (42.74 m) overall, engine and tender, the S1 was the longest reciprocating steam locomotive ever; it also had the heaviest tender (451,840 lb / 205 tonnes), highest tractive effort (76,403 lbf (339.86 kN)) of a passenger steam engine when built and the largest driving wheels (7 feet in diameter) ever used on a locomotive with more than three driving axles. The problem of wheel slippage, along with a wheelbase that was too long for many of the rail line's curves, limited the S1's usefulness. No further S1 models were built as focus shifted to the much smaller but more practical class T1 in June 1940. Design of the 4-4-4-4 T1 and the 6-4-4-6 S1 occurred concurrently, however, the S1 was the first produced.