Pingguoyuan station

Pingguoyuan[1]

苹果园
Beijing Subway
Line 6 platform

Line S1 originating platform
General information
LocationPingguoyuan South Road (苹果园南路)
Pingguoyuan Subdistrict, Shijingshan District, Beijing
China
Coordinates39°55′36″N 116°10′39″E / 39.926727°N 116.177388°E / 39.926727; 116.177388
Operated byBeijing Mass Transit Railway Operation Corp., Ltd
Line(s)     Line 1 (under renovation)
     Line 6
     Line S1
Platforms6 (1 island platform and 2 side platforms, 2 side platforms under renovation)
Tracks6
Construction
Structure typeUnderground (Line 1 & Line 6)
Elevated (Line S1)
AccessibleYes
Other information
Statusin service (Lines 6 & S1)
Service suspended until 2025 (Line 1)[2]
Station code103 (Line 1)
History
OpenedApril 23, 1973; 51 years ago (1973-04-23) (Line 1)
December 31, 2021; 2 years ago (2021-12-31)[3] (Lines 6 and S1)
ClosedApril 18, 2020; 4 years ago (2020-04-18) (Line 1) (for renovation until 2025[2])
Services
Preceding station Beijing Subway Following station
Jin'anqiao
Terminus
Line 6 Yangzhuang
towards Lucheng
Jin'anqiao
towards Shichang
Line S1 Terminus
Location
Pingguoyuan[1] is located in Beijing
Pingguoyuan[1]
Pingguoyuan[1]
Location in Beijing

Pingguoyuan station[1] (simplified Chinese: 苹果园站; traditional Chinese: 蘋果園站; pinyin: Píngguǒyuán zhàn) is a station on Line 1, Line 6 and Line S1 of the Beijing Subway, located in Pingguoyuan Subdistrict, Shijingshan District, Beijing.

The station for Line 1 was opened on April 23, 1973. Pingguoyuan station on Line 1 is closed for renovation from April 18, 2020 to 2025.[2] The station for Line 6 and Line S1 was opened on December 31, 2021.

The Line 1 station and Line 6 station are underground, and the Line S1 station is elevated.

  1. ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
  2. ^ a b c "地铁1号线福寿岭站、苹果园站何时建成开通?". Archived from the original on 2022-03-19. Retrieved 2022-03-19. 且苹果园站是停运不停车,施工过程中还要确保地铁列车运行安全,所以施工进度有延迟。结构施工完成后还将进行机电设备、装修施工,预计在2023年底开通
  3. ^ "市重大项目办到苹果园交通枢纽现场办公". 2019-11-20.