Purpose | Irrigation & Water supply |
Status | Operational |
Construction began | 1852 |
Opening date | 1855 |
Owner(s) | Government of Andhra Pradesh |
Dam and spillways | |
Type of dam | Barrage |
Impounds | Krishna River |
Length | 1,223.5 m (4,014 ft) |
Reservoir | |
Catchment area | 251,372 km2 |
Surface area | 30 km2 |
Maximum water depth | 6.11 m[1] |
Website irrigationap |
The Prakasam Barrage stretches 1223.5 m across the Krishna River connecting Vijayawada, NTR and Mangalagiri Tadepalle Municipal Corporation, Guntur districts in Andhra Pradesh, India. The barrage serves also as a road bridge and spans over a lake. The three canals associated with the barrage run through the city of Vijayawada, crossing it and giving it a Venetian appearance.
The idea of constructing a dam across the river Krishna dates back to 1798. It began in the hands of captain Buckle and was revised in 1839 and 1841 by Captain Best and Captain Lake. After the endorsement of Major Cotton, the board of Directors of the East India Company approved it on 5 January 1850. The dam was started in 1852 and completed in 1855. It cost Rs 1.75 crore in those days and seems to have paid the then government a return of 18%. It used to irrigate 7 lakh acres.[2]
Later, the State Government constructed a bridge that was named after Tanguturi Prakasam, the first Chief Minister of Andhra (a state formed in 1953, which later became Andhra Pradesh in 1956 after the merger of Telugu speaking districts of former Hyderabad State). Completed in 1957, it helps to irrigate over 1.2 million acres of land. This barrage also supplies water to Buckingham canal which was initially constructed as an inland navigation canal but was later used as an irrigation water supply canal. One of the first major irrigation projects of South India, the Prakasam Barrage in Vijayawada was completely successful in its mission.[citation needed]
Andhra Pradesh largely owes its rich agriculture to the Prakasam Barrage as the project facilitated the irrigation of large tracts of farmland. The Barrage provides views of the lake. It has become a tourist attraction of Vijayawada. On 13th Feb-2019 Andhra Pradesh chief minister Nara Chandrababu Naidu laid foundation[3] to construct a new barrage named Vykuntapuram Barrage on the Krishna River nearly 25 km upstream of Prakasam Barrage. The designed maximum water level is 22.13 m msl whereas the full reservoir level is 17.39 m msl with a scope to enhance the live water storage by increasing the gates height by 4.74 m height to enable the back waters reach the toe of the Pulichinthala Dam at 20 m msl for pumping water into the Pulichinthala reservoir.[1] The maximum flood flow experienced at the barrage was 1.11 million cusecs at 20.97 m msl on 5 October 2009.[1] During the severe floods in September 2024, the peak flood flow reached 1.06 million cusecs at the barrage against the designed flow of 1.19 million cusecs.[4]