Rashtreeya Vidyalaya Road | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Namma Metro station | ||||||||||||||||
General information | ||||||||||||||||
Other names | R. V. Road, Rashtreeya Vidyalaya Raste, R. V. Raste, Jayanagara 5th Block, Jayanagar 5th Block | |||||||||||||||
Location | Rashtreeya Vidyalaya Road, 5th Block, Jayanagar, Bengaluru, Karnataka 560041 | |||||||||||||||
Coordinates | 12°55′17″N 77°34′49″E / 12.921458°N 77.580375°E | |||||||||||||||
Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | |||||||||||||||
Operated by | Namma Metro | |||||||||||||||
Line(s) | Green Line Yellow Line | |||||||||||||||
Platforms | Side platform Platform-1 → Madavara Platform-3 → Train terminates here Platform-4 → Bommasandra Platform numbers (TBC) | |||||||||||||||
Tracks | 2 + 2 (U/C) | |||||||||||||||
Connections | Upcoming Yellow Line | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated, Double track | |||||||||||||||
Platform levels | 2 | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Status | Staffed | |||||||||||||||
Station code | RVR | |||||||||||||||
History | ||||||||||||||||
Opened | 18 June 2017 | |||||||||||||||
Opening | January 2025 (TBC) | |||||||||||||||
Electrified | 750 V DC third rail | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Rashtreeya Vidyalaya Road is an elevated interchange metro station on the North-South corridor of the Green Line and the East-West corridor of the upcoming Yellow Line of Namma Metro serving the 5th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.[1]
As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025[2] due to lots of trial runs along with more trainsets which are needed for commencement of operations.[3][4][5][6][7]