Station statistics | |
---|---|
Crew | 4 |
Launch | after 2021 |
Carrier rocket | Space Launch System |
Mission status | Proposed |
Mass | 37,300 kilograms (82,200 lb)[1] |
Length | 11.15 meters (36.6 ft) |
Diameter | 8.5 meters (28 ft) |
Pressurised volume | 495 cubic meters (17,500 cu ft) |
Orbital inclination | 5.145° to the ecliptic |
Orbital period | |
Configuration | |
Skylab II was a space station concept proposed in 2013 by the Advanced Concepts Office of NASA Marshall Space Flight Center, to be located at the Earth-Moon L2 Lagrangian point.[3] Proposed by NASA contractor Brand Griffin, Skylab II would have been constructed as a "wet workshop" using a spent upper-stage hydrogen fuel tank from the Space Launch System (SLS), much as the Skylab was originally planned to be built "wet" from the spent bipropellant tanks of the Saturn S-IVB upper stage.[3] If constructed, Skylab II would have been the first crewed outpost located beyond the orbit of the Moon.[4]
griffin-2013
was invoked but never defined (see the help page).{{cite news}}
: CS1 maint: bot: original URL status unknown (link)