Solar power in Jamaica

Jamaica's solar potential

Jamaica's electricity sector is dominated by non-renewable generators that use petroleum products, primarily Bunker C fuel oil and automotive diesel which generated 93% of the annual output for 2014. There is a small contribution from a few small hydroelectric plants and a couple of wind farms, one of which, Wigton Wind Farm,[1] contributes a very small amount despite being the largest wind farm in the Caribbean.

In 2005, Jamaica embarked on the preparation of a 25-year National Development Plan called "Vision 2030" which encompassed the National Energy Policy 2009–2030.[2] The policy was adopted in late 2009 and followed in 2010 by a National Renewable Energy Policy 2009–2030. According to the message from the then minister responsible for energy, "Since 2005, Jamaica has embarked upon the preparation of a 25-year National Development Plan called Vision 2030 which is expected to put the country in a path to achieve developed country status by 2030. One of the expected outcomes of the plan is the diversification of Jamaica's energy supply to increase energy security and to contribute to the cost efficiency of the country's energy sector."

After the National Energy Policy was approved the authorities set about creating a regulatory and technical framework for the interconnection of solar PV systems to the national grid in consultation with the grid operator. The result was the formulation of a Standard Offer Contract for the sale of electricity to the grid under a net billing arrangement.[3] Under the net billing arrangement any electricity not consumed on the premises it is produced, is delivered to the grid and is purchased by the grid operator at a price set by the Office of Utilities Regulation to be close to the avoided cost of generation by the existing suppliers. That price is available at the regulators web site. Any electricity consumed from the grid is billed at the regular retail prices and at the end of the month the difference between the delivered and consumed amounts is settled. Technical guidelines for the interconnection to the grid are also now available and the Government Electrical Inspectorate is prepared to perform inspection of installations. This is the basis on which most major installations have proceeded.

  1. ^ "Wigton Wind Farm Company". Retrieved 26 June 2015.
  2. ^ Cite error: The named reference mstem.gov was invoked but never defined (see the help page).
  3. ^ Cite error: The named reference myjpsco was invoked but never defined (see the help page).