South Hook LNG terminal

51°43′12″N 5°04′44″W / 51.720°N 5.079°W / 51.720; -5.079

South Hook LNG terminal under construction in 2008

South Hook LNG terminal is an LNG regasification terminal near Milford Haven and is the largest LNG terminal in Europe.[1] Together with the smaller Dragon LNG terminal nearby, it can handle up to 25% of the UK's gas requirement. The first tanker docked on 20 March 2009.[2][3][4]

  1. ^ "Port awaits liquid gas delivery". BBC. 20 March 2009. Retrieved 20 March 2009.
  2. ^ "Timeline: LNG plants in Wales". BBC News Online. 19 March 2010. Retrieved 1 March 2010.
  3. ^ "Dragon LNG Terminal To Open In Q2 – BG". Downstream Today. 4 February 2009. Retrieved 17 February 2009.
  4. ^ "FACTBOX-Europe LNG import terminals to open by 2011". Reuters. 19 January 2009. Retrieved 17 February 2009.