Spain-Morocco interconnection | |
---|---|
Location | |
Country | Spain, Morocco |
General direction | north–south |
From | Tarifa |
Passes through | Strait of Gibraltar |
To | Fardioua |
Ownership information | |
Partners | Morocco’s National Office of Electricity, Red Eléctrica de España |
Construction information | |
Commissioned | 1997 |
Technical information | |
Type | subsea cable |
Type of current | AC |
Total length | 59 km (37 mi) |
Power rating | 800 MW |
AC voltage | 400 kV |
Spain-Morocco interconnection is a submarine power cable between Tarifa terminal in Spain and Fardioua terminal in Morocco. The purpose of the cable is to connect energy infrastructure between Europe and Africa.[1][2]
The Spain-Morocco interconnection includes two 400 kV lines, commissioned in 1997 and 2006 that have a combined power of 1,400 MW and consisting of seven cables: three for each circuit, plus one for reserve.[3] The capacity dedicated for commercial use is equal to 900 MW in the Spain to Morocco direction, and equal to 600 MW in the Morocco to Spain direction.[4]