PY08 Sri Damansara Timur | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
| MRT station | |||||||||||
General information | |||||||||||
Other names | Chinese: 斯里白沙罗东站 | ||||||||||
Location | Bandar Sri Damansara, Sungai Buloh, Selangor Malaysia | ||||||||||
Owned by | MRT Corp | ||||||||||
Operated by | Rapid Rail | ||||||||||
Line(s) | 12 Putrajaya | ||||||||||
Platforms | 1 island platform (MRT) | ||||||||||
Tracks | 2 | ||||||||||
Connections | Connecting station to KA07 Kepong Sentral for KTM Komuter and KTM ETS | ||||||||||
Construction | |||||||||||
Parking | Available | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Status | Operational | ||||||||||
Station code | PY08 | ||||||||||
History | |||||||||||
Opened | 16 June 2022 | ||||||||||
Services | |||||||||||
|
The Sri Damansara Timur MRT station (Working name: Kepong Sentral[1]) is a mass rapid transit (MRT) station in the township of Bandar Sri Damansara in Damansara, Selangor, Malaysia. It is one of the stations on the MRT Putrajaya line.
The station began operations on 16 June 2022, as part of Phase One operations of the Putrajaya Line.[2]