Sungai Buloh station

 KA08   PY04  Sungai Buloh
KTM_Logo KTM_Komuter_Logo KTM_ETS_Logo Rapid_KL_Logo
Commuter rail, Inter-city rail and MRT station
The station's signboard after being transferred to Putrajaya Line and the trainset is entering the station from Kampung Batu.
General information
Other namesMalay: سوڠاي بولوه (Jawi)
Chinese: 双溪毛糯
Tamil: சுங்கை பூலோ
LocationSungai Buloh, Selangor
Malaysia
Coordinates3°12′22″N 101°34′49″E / 3.20611°N 101.58028°E / 3.20611; 101.58028
Owned byMRT Corp
Railway Assets Corporation
Operated byRapid Rail
Keretapi Tanah Melayu
Platforms2 side platform (KTM)
1 island platform (MRT)
Tracks4 (KTM)
2 (MRT)
Construction
Structure type KA08  At-grade
 PY04  Elevated
ParkingAvailable with payment. 1236 parking bays, 258 motorcycle bays.
Bicycle facilitiesAvailable. 16 bicycle bays.
AccessibleYes
Other information
Station code KA08 
 PY04  (after 16 June 2022)
 KG01  (before 16 June 2022)
History
Opened1892; 132 years ago (1892) (KTM)
16 December 2016; 7 years ago (2016-12-16)
 KG01 
16 June 2022; 2 years ago (2022-06-16)
 PY04 
Rebuilt2016; 8 years ago (2016) (KTM)
Electrified1995; 29 years ago (1995) (KTM)
Services
Preceding station Keretapi Tanah Melayu
(Komuter)
Following station
Kuang Tanjung Malim–Port Klang Line Kepong Sentral
towards Port Klang
Preceding station Keretapi Tanah Melayu (ETS) Following station
Ipoh
towards Padang Besar
KL Sentral–Padang Besar (Express) Kuala Lumpur
Tanjung Malim
towards Padang Besar
KL Sentral–Padang Besar (Platinum)
Tanjung Malim
towards Butterworth
KL Sentral–Butterworth (Platinum)
Rawang
towards Padang Besar
Padang Besar–Gemas (Gold) Kuala Lumpur
towards Gemas
Batang Kali
towards Butterworth
Butterworth–Gemas (Gold)
Rawang
towards Ipoh
KL Sentral–Ipoh (Gold) Kepong Sentral
KL Sentral–Ipoh (Silver)
Preceding station Following station
Kampung Selamat Putrajaya Line Damansara Damai

The Sungai Buloh station is an integrated railway station serving the suburb of Sungai Buloh in Selangor, Malaysia, which is located to the northwest of Kuala Lumpur.

It is an interchange station, with one section catering to the KTM Komuter Tanjung Malim-Port Klang Line and KTM ETS services, and another section for the MRT Putrajaya Line (formerly the MRT Kajang line). However, there is no paid-area integration between both sections as the two services use different ticketing systems. The newly built integrated station was opened on 16 December 2016 together with the opening of the first phase of the Kajang Line.[1]

The station was the northern terminus of the Kajang Line until October 2021. The MRT station was closed along with  PY03  Kampung Selamat and  KG04  PY01  Kwasa Damansara until the opening of the Putrajaya line.[2] Their transfer to the Putrajaya line was completed when it began partial operations on 16 June 2022.[3]

  1. ^ "Prime Minister Launches Phase One of the MRT Sungai Buloh-Kajang Line" (PDF). Klang Valley MRT Project. Mass Rapid Transit Corporation Sdn Bhd. Archived from the original (PDF) on 5 March 2017. Retrieved 1 April 2017.
  2. ^ "Three MRT stations closed temporarily". The Star Online. Retrieved 12 October 2021.
  3. ^ Ibrahim, Junaid (16 June 2022). "New Putrajaya Line source of enthusiasm, optimism for commuters". The Star. Sungai Buloh, Selangor. Retrieved 16 June 2022.