The Big Move rapid transit projects

The Big Move is a regional transportation plan (RTP) published in 2008 and consisting of 62 rapid transit projects to be implemented across the Greater Toronto and Hamilton Area (GTHA).[1] These rapid transit projects are intended to form a seamlessly integrated regional rapid transit network, which is the first priority action in the regional transportation plan.[2] These projects form two long-term templates with 15 and 25 year horizons. These templates outline broad projects; specific details about technology, alignment, stations and service levels for each project are subsequently determined though a cost–benefit analysis or an environmental assessment process.[3][4]

  1. ^ Metrolinx, Schedules 1 & 2
  2. ^ Metrolinx, p. 23
  3. ^ Metrolinx, p. 22
  4. ^ Metrolinx, p. 96