U2 (Nuremberg U-Bahn)

U2
Overview
Stations16
Service
TypeRapid transit
SystemNuremberg U-Bahn
Operator(s)Verkehrs-Aktiengesellschaft Nürnberg
Rolling stock
History
Opened28 January 1984 (1984-01-28)
Completed27 November 1999 (1999-11-27)
Opening of U3 - begin of automatic operation on U2 tracksJune 14, 2008 (2008-06-14)
Conversion to fully automated operation completedJanuary 2, 2010 (2010-01-02)
Technical
Line length13.2 km (8.2 mi)
Number of tracksDouble track except between Ziegelstein station and Flughafen station where a single track stretch exists
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Route map

0.0 km
Röthenbach
1.3 km
Hohe Marter
2.0 km
Schweinau
Deutsche Bahn S-Bahn R-Bahn
2.5 km
St. Leonhard
Deutsche Bahn S-Bahn
3.3 km
Rothenburger Straße
S-Bahn
4.3 km
Plärrer
Nuremberg tramway
to Roth
to Augsburg
Deutsche Bahn S-Bahn
5.0 km
Opernhaus
5.5 km
Nürnberg Hauptbahnhof
Deutsche Bahn S-Bahn R-Bahn Nuremberg tramway
Dürrenhof
Deutsche Bahn
S-Bahn
Deutsche Bahn
6.3 km
Wöhrder Wiese
Nuremberg tramway
6.8 km
Rathenauplatz
Nuremberg tramway
7.5 km
Rennweg
8.1 km
Schoppershof
9.0 km
Nordostbahnhof
R-Bahn
9.9 km
Herrnhütte
R-Bahn
10.8 km
Ziegelstein
13.2 km
Flughafen
Airport interchange

The U2 is an underground line in Nuremberg, opened on 28 January 1984 and the last station along the line to open was Flughafen (Airport) in 1999. The line is about 13.1 kilometres (8.1 mi) long and has 16 stations; the termini are Röthenbach and Flughafen. Since 2010 all trains in regular operations have been run driverless. At 2,388 metres (7,835 ft) the stretch between Ziegelstein station and Flughafen station is the longest interval between two stations in the network and the only single track section on any subway line in Germany (both stations have two platform tracks, but the track between the two is a single track without passing loops).