Upper Corris Tramway

Upper Corris Tramway
Overview
Other name(s)Ty'n y Berth Tramway
Termini
Service
TypeHorse-drawn industrial tramway
SystemCorris Railway
History
Opened1859
Closed1927
Technical
Line length1.8 mi (2.9 km)
Track gauge2 ft 3 in (686 mm)

The Upper Corris Tramway was a 2 ft 3 in (686 mm) gauge horse-worked tramway that connected the slate quarries around the villages of Corris and Corris Uchaf with the Corris Railway at Maespoeth Junction. It was just over 1.8 miles (2.9 km) long.[1]

  1. ^ Cite error: The named reference Richards2001 was invoked but never defined (see the help page).